WERNER

Project Type:             Addition in Cherrywood                    

​

PROJECT BACKGROUND & OBJECTIVES

M and D live in Cherrywood with their son and love their current location. Their 2 bedroom 1 bath house has worked to date but is starting to feel tight. M is currently working out of the garage apartment above the garage/workshop. The washer and dryer are in the unconditioned garage right now. The scope includes a new primary suite, laundry inside the house, a small kitchenette at the Garage Apartment and a 1/2 bath if possible in the main house.

​

DESIGN GOALS BY PRIORITY:

  • 456 sf Addition

  • Primary suite: bedroom, bath with sink, shower and toilet (toilet does not have to be in a separate space), and closet (can space for custom furniture)

  • Laundry room inside (current laundry is in garage)

  • Kitchenette at Garage Apartment to convert to 2nd dwelling unit 

  • Small offce at Addition

​

PROJECT DELIVERABLES: WHAT’S IN?

  • The addition is off the Family Room. The addition will be slab on grade foundation with wood siding, wood windows and composite shingle roof to match the existing house.

  • The addition will include: primary bedroom, primary closet, primary bath and laundry.

  • The kitchen will be remodeled to move the refrigerator to accommodate better circulation to the new primary suite.

  • The Garage Apartment kitchenette will have a sink, countertop, base cabinet, shelves and a mini refrigerator.

​​

OPTIONAL UPGRADES

  • Larger remodel at Garage Apartment

​

PROJECT EXCLUSIONS: WHAT'S OUT?

  • Landscaping

  • Moontower Design Services 

  • Consultant Services (structural, geotechnical, etc)

  • Regulatory Fees (permitting, sidewalk fee in lieu, etc)

​

PROJECT CONSTRAINTS:

  • 3 larger trees to protect & stage construction around

  • clients want to live in house as long as possible

  • tight setbacks

​

  • PROJECT ASSUMPTIONS: 

  • To avoid the protected trees, the site will be accessed from Concordia; part of the wood fence will be removed.

  • The electrical panel will be moved to Addition and will be upgraded to meet current code. 

  • The existing foundation is in good condition and does not need repair. 

  • The soil conditions are good and a standard depth slab on grade foundation will be installed at the addition.

  • The existing framing is in good condition and does not need to be replaced, except as required to accommodate the new design.

  • The existing grinder pump can remain in place.

  • The existing mechanical units are in good condition and can remain.

  • The existing water heater is in good condition and can remain in place.

​

SCHEMATIC DESIGN​

Budget Range (excludes landscape and design services): 350-390K

Construction Timeline Range:  9-12 months

Proposed Square Footage Calculations:

 

1st Floor Addition 451sf

Remodel area 35sf

Total 486 sf

​

​